S-163 Marota City – Perfect Tower

Design study for a residential tower in Marota City

Design Render Shots

Under Construction

The engineering team of the Consulting Center for Architecture and Construction is supervising the entire structure implementation work for the tower located in the heart of Damascus, Marota City. So far, approximately 75 percent of the work has been implemented, with a total casting quantity of approximately 10,000 cubic meters.

All work is carried out according to a timetable drawn up and followed daily by management engineers. These plans are also linked to achieve the required productivity, whether monthly or throughout the year.

Before casting, all iron and casing works are received according to the drawings and technical specifications

The engineering team is distinguished from others by following up and monitoring all materials used for implementation, including iron, concrete and blocks, by testing these materials with tension and pressure and submitting official reports from accredited laboratories.